WHERE IS YOUR MONEY GOING? Part Three — NESO Spent £686m, but Ofgem Rated Value for Money Below Expectations

£686 MILLION SPENT.

£773,650 IN REPORTED CHIEF EXECUTIVE REMUNERATION.

AND OFGEM SAYS THE EVIDENCE OF VALUE FOR MONEY WAS BELOW EXPECTATIONS.

This is Britain’s publicly owned National Energy System Operator — the organisation responsible for keeping the electricity system balanced and helping plan its future.

It is not a private company paying dividends to outside shareholders. It is owned by the government.

So where is the money going — and who is making sure the public gets value for it?

Part Three of our Where Is Your Money Going? investigation examines NESO’s published accounts, executive remuneration, consultants, operational costs and the regulator’s own findings.

The £686 million figure — and the regulator’s verdict

NESO’s regulatory spending in the financial year 2025/26 was £686 million, compared with £690 million in its proposed business plan.

That is a substantial sum for a publicly owned organisation with responsibility for system operations, energy planning, data, technology, connections reform and critical infrastructure resilience.

In its September 2026 assessment of NESO’s Business Plan 3, Ofgem concluded that NESO met expectations overall for the period April 2025 to March 2026. It recognised delivery against its operational objectives and progress across planning and digitalisation.

But Ofgem also graded NESO’s demonstration of value for money as “below expectations”. It said the organisation had not supplied enough positive evidence of consistently balancing the benefits of spending against its costs.

Ofgem noted that much of the apparent underspend resulted from £34 million of expenditure being deferred, rather than achieved through efficiency savings. The regulator did not identify examples of obviously poor-value decisions; its concern was the lack of systematic evidence that expenditure was being optimised.

That is a serious distinction. Meeting operational objectives does not remove the need to demonstrate that the work was delivered at the best reasonable cost.

The chief executive’s pay: £773,650 — plus a separate National Grid payment

Portrait of Fintan Slye, Chief Executive of the National Energy System Operator
Fintan Slye, NESO Chief Executive. NESO’s latest published statutory directors’ remuneration table, covering 2024/25, reports £773,650 in total remuneration. National Grid separately paid £156,870 under a transition-related retention scheme. Source: NESO Annual Report and Accounts 2024/25, page 94. Photograph from the campaign site’s existing media library.

The latest published full statutory remuneration report located for this investigation covers the year ended 31 March 2025. During the first half of that year, the organisation was still owned by National Grid; it became the publicly owned NESO on 1 October 2024.

Its audited single-figure remuneration table records the following for Chief Executive Fintan Slye:

  • Salary during the reporting year: £288,167.
  • Benefits: £18,431.
  • Pension contributions: £57,633.
  • Annual performance award: £134,000.
  • Long-term performance award: £275,419.
  • Total reported NESO remuneration: £773,650.

The same accounts separately disclose £156,870 paid directly by National Grid to Mr Slye under a retention scheme following NESO’s establishment. Combining the two disclosed figures gives £930,520 in remuneration and the separate transition payment relating to 2024/25. It would be misleading to describe the whole amount as a salary paid by the publicly owned NESO.

At a House of Commons committee hearing on 28 October 2026, Mr Slye said his current base salary was £309,000. That is distinct from the earlier full-year remuneration and performance-award figures.

Should executive rewards in a publicly owned, consumer-funded system operator depend more visibly on verified value for money, delivery dates and service to electricity users?

Other executive pay

NESO’s 2024/25 remuneration disclosures recorded £564,311 for Chief Operating Officer Kayte O’Neill, including £255,000 salary and performance awards. The report also separately disclosed a £105,000 National Grid transition-retention payment to her, representing part of an inherited arrangement.

Chief Financial Officer Charlie Pate received £317,451 in total reported remuneration, including £206,750 salary and a £68,786 annual performance award.

These are the disclosed figures for 2024/25, not a claim about what they have received in 2025/26 or 2026/27. The latest published annual remuneration table should be updated when the next set of accounts becomes available.

NESO’s board and remuneration committee approve or oversee these arrangements, while the government is the shareholder. The public should be able to judge whether the targets that trigger incentives are sufficiently demanding and transparently measured.

Staff, payroll, consultants and temporary workers

Our earlier draft examining DESNZ, Ofgem and NESO identified another substantial cost base from NESO’s 2024/25 statutory accounts.

That year the organisation reported approximately 2,076 average employees and £161 million in total payroll. Of that payroll, £126 million was charged to the income statement and £35 million capitalised into assets. The £35 million is part of the £161 million, not an extra amount.

The same accounts disclose £14 million in consultancy expenditure and £44.5 million in contingent labour. Consultancy refers to strategic management advice; contingent labour refers to temporary staff supporting operations or service delivery. Different suppliers may deliver essential specialist work, but that does not make cost scrutiny unnecessary.

These figures are from 2024/25, while the £686 million regulatory-spending figure above is from 2025/26. They must not be casually added together as though they describe the same spending envelope or financial year.

The public deserves to see how much of NESO’s growth creates lasting operational capability, how much is temporary external support, and how much is spent on contractors that may continue year after year.

The much bigger figure: £3.1 billion to balance the system

NESO also administers large payments needed to keep the electricity system stable in real time. These are not simply its own staff or office costs.

In a 3 November 2026 explanation, NESO reported that balancing costs rose to £3.1 billion in 2025/26, up by 16% on the previous year.

About £2 billion arose from thermal constraints: situations in which the transmission network cannot safely move all the electricity generated in one area to where it is needed. In those circumstances, the operator may have to reduce output elsewhere and purchase alternative generation nearer demand.

NESO says a little under £500 million was paid to wind farms to turn down in 2025/26. It also reports that operational actions delivered an estimated £900 million in balancing-cost savings during that period. Both the costs and claimed savings should be examined using like-for-like counterfactuals.

Balancing is essential. It is not correct to label every balancing payment waste. But rising costs due to constraints make the location, timing and engineering feasibility of new generation and network developments an essential public issue.

NESO’s £3.1 billion balancing-cost figure is separate from its £686 million regulatory business expenditure. Nor should balancing costs automatically be added to transmission-use-of-system charges and described as a single bill without explaining the charging boundaries.

Where the electricity charges actually go

Diagram of how electricity system charges are administered through NESO and passed to transmission owners and balancing service providers
Follow the money. The diagram from our earlier NGET/NESO investigation illustrates how regulated industry charges flow through the system. It is a simplified explanation, not an audited transaction ledger.

NESO administers Transmission Network Use of System (TNUoS) charging, which largely recovers allowed revenue for the transmission network owners, and Balancing Services Use of System (BSUoS) charging, used to recover balancing costs and relevant operator costs.

NESO is government-owned, but that does not mean all its funding arrives as an ordinary Treasury grant. Much of the money passes through regulated electricity-industry charging arrangements that can feed through to what consumers and businesses ultimately pay.

It is vital not to count money NESO collects and passes on to transmission owners as though it were also NESO’s own sales revenue, and then add both figures to claim a larger public bill.

The right question is who is charged, what the payment funds, who receives it, and how the cost reaches the end customer.

Connections reform: promises and delays

One of NESO’s most important responsibilities is reforming the enormous queue of projects waiting for electricity-grid connections.

Ofgem’s 2025/26 assessment explicitly identified connections reform as a significant area of underperformance, citing missed deadlines, unclear prioritisation, inaccurate offers and uneven customer engagement. It acknowledged the ambitious scale of the work.

This matters beyond industry administration. Renewable generators, factories, data centres, batteries and other projects rely on credible network-connection dates. A connection offer is not the same as completed physical infrastructure.

When projects are promoted to the public on the strength of future electricity connections, who is independently verifying that the required substations, transformers and transmission works can actually be delivered on schedule?

The October investigation: what was and was not established

There is another development that cannot be ignored in examining the organisation’s governance.

On 19 October 2026, NESO published the results of an independent Eversheds Sutherland investigation into allegations about operational decision-making and record-keeping during the June 2026 heatwave.

The investigators did not substantiate the allegations of inappropriate influence over operational decisions or deliberate concealment or alteration of control-room records.

However, the investigation identified concerns about working culture, governance and communication, including how staff concerns are heard and acted upon. Ofgem separately described those cultural findings as requiring improvement. NESO accepted the recommendations and committed to an action plan.

A separate Ofgem technical review of the June system events was still ongoing at the time of this article. Its preliminary report said system frequency did not go outside statutory limits, and NESO noted that customers were not disconnected as a result of the incident.

It would be wrong to present unsubstantiated allegations as proven. But the confirmed need for cultural and governance improvements is plainly relevant to the leadership and accountability of a national system operator.

A publicly owned organisation should be publicly accountable

NESO has a demanding job. Control-room teams have to keep power flowing every minute. Engineers and planners must prepare for demand changes, failures and future energy needs. Those responsibilities require competent, well-paid people and substantial modern technology.

None of that excuses weak evidence of financial value, missed implementation deadlines or poor organisational accountability.

Ofgem’s assessment gives us the central question: why should an organisation spending £686 million be unable to demonstrate value for money to the regulator’s expected standard?

We need to see the cost and progress of individual programmes, a clear annual record of executive rewards and performance targets, the cost of consultants and temporary staff, and an independently auditable explanation of whether proposed system changes are reducing total bills.

Keeping the lights on is essential. Showing where the money goes should be essential too.

Shane Oxer — Campaigner for fairer and affordable energy

Sources and accounting notes

  1. Ofgem, End-scheme assessment of NESO Business Plan 3, published September 2026, especially the executive summary on value for money, connections reform and deferred expenditure.
  2. NESO Annual Report and Accounts 2024/25, directors’ remuneration report p. 94, consultancy and contingent labour p. 103, staff and financial disclosures.
  3. NESO Business Plan 3 End-Scheme Report 2025/26, expenditure of £686 million.
  4. NESO, The Balancing Act, 3 November 2026, balancing-cost definitions and total.
  5. NESO, The Balancing Act Part 2, 9 November 2026, wind turn-down and reported operational savings.
  6. NESO, Independent Investigation Findings, 19 October 2026.
  7. Ofgem, update on the Eversheds investigation and the technical review, 19 October 2026.
  8. House of Commons Energy Security and Net Zero Committee, oral evidence 28 October 2026.

Evidence note: The £686m is NESO’s 2025/26 regulatory expenditure, not the total cost of operating and balancing the GB electricity system. The full remuneration, staff payroll, consultancy and contingent-labour figures refer to 2024/25; they are not presented as 2025/26 actuals. The extra £156,870 retention award was paid directly by National Grid and is not included twice in NESO’s £773,650 table. System-wide balancing payments, transmission charges and operator expenditure are different cost measures. Ofgem’s conclusion was “met expectations” overall and “below expectations” on value for money; both judgements are reported.